The dam was designed for inspections to be made using stairways and lifts. The perimeter gallery runs from the right side around the perimeter to the end of the dam, then runs up the left side, always above the level of the foundations. It therefore runs the entire perimeter of the dam. This perimeter gallery connects with the four horizontal galleries that the technicians visit every day to take measurements and readings with the listening equipment to measure the variables.